Under Construction March 2007
2nd March 2007
<-- Index | Showing 1-5 of 5 pictures | Index -->
Early days, the boards are under construction and the layout plan has been laid out. this was subsequently changed to delete the headshunt as this was not very "highland".
The view eastward.  The But n Ben got swapped to the other side of the track eventually.
The view eastward. The But n Ben got swapped to the other side of the track eventually.
000_0071.jpg

000_0072.jpg

000_0075.jpg
The original intention was to have a headshut that supported the yard.  This was found to be most un Highland (almost without precedent indeed!).  There would have been so few trains, blocking out the section that the engine needed to shunt in was never a problem.
The original intention was to have a headshut that supported the yard. This was found to be most un Highland (almost without precedent indeed!). There would have been so few trains, blocking out the section that the engine needed to shunt in was never a problem.
000_0076.jpg

000_0077.jpg